Imperial College Triple Stack Project

The above is a triple stack project that was project managment accommodation for ISG interiors. Welfare facillities were on the ground floor, with the first and second floors housing offices and meeting rooms. It was sited in the main central London campus of the imperial college, to the rear of the nation history musuem. The project cost cerca 150k, it was installed and completed within three days. As the site was located in a quadrant of buildings, increased fire protection was needed, so the project included hardwood Georgian wire fixed pane windows and hardwood doors. Once installed a fire resistant mid-band was fitted between the floors.

August 23rd, 2012|

Raynham Primary School Modular for Enfield Borough Council.

This Project was a 6.6 x 9.6m music room. It was erected yesterday (23/08/12) with handover due on 31/8/12. Value circa £85,000 including groundworks and mains connections.
This order was placed extremely late and Danzer have pulled all the stops out to achieve the start of autmn term deadline.

August 23rd, 2012|

Hillocks Primary School Project, Sutton in Ashfield

Plastisol steel exterior. Internally with eggshell painted plasterboard and taped and filled joints. Suspended ceiling.

Hillocks Primary School, Sutton in Ashfield.

We manufactured and supplied the above accommodation for Mansell Construction and Notts county council. It is another Danzer module completed to customer satisfaction on schedule, as always. This particular module was a 8.7 x 16.8m double classroom with toilet facilities and cloakroom.

August 23rd, 2012|

Total Hire and Sales


We have an existing relationship with Thomlinsons’ Total Hire and Sales. We manufacture our product in the Nottingham based based factory and sell them on.

August 23rd, 2012|

Triple Stack Modular Building Projects


We produce many triple stack modular buildings installed on site, with the above being projects for Thomas Barnes Construction and Moser engineering.

August 23rd, 2012|

High Spec Modular Building

Danzer manufacture bespoke products for many companies, including steel sales units as seen above. Customers include Wainshomes group, Miller Homes and Jones Homes to name a few.

August 23rd, 2012|

Garden Offices join AV’s product portfolio

Modular Building, Manchester as Garden Office

Recently installed into our clients garden, errected on site and ready for occupation 24 hours after delivery. It is fully insulated thus offering a year round facility. Easily connected to mains electricity and other office facilities.

A clean comfortable enviroment whatever your application all year round.

August 17th, 2012|

BAM Glan Clwyd

BAM Construction, Modular Building in Glan Clwyd as Patient Record Storage

BAM Construction are carrying out extensive works at Clan Clwyd Hospital part of which is a total refurbishment of their patient record store. A medium term solution was required and BAM turned to Danzer to help them. Danzer provided a single storey record facility with some additional offices at first floor.

The ground the unit was being placed on, slopes dramatically so extensive foundation had to be installed to take the weight of the building ,with the documents in, and to ensure it remained flat to allow the rolling archive system to operate. The restricted space also lead to a complicated ramp and staircase to enable access.

August 17th, 2012|

BAM Aintree

BAM Aintree Project, Triple Storey Modular Building

BAM are carrying out extensive development work at Aintree and as part of that development are knocking down and removing an old modular building which provided office accommodation for the consultants and some administrative staff. A site within the Aintree complex was allocated and BAM turned to Danzer to come up with a solution.

The new building would need to connect with an existing building at height to provide access to the second floor. However the floor levels did not meet requiring a “filler” level, in the new building, something other manufacturers were unable to provide.

Danzer provided the building using its Steel OpenSpace product with 15no 9.6 x 3m modules over 2 floors and an intermediate filler level. The building also included an enclosed staircase and a canopy walkway across part of the front and the side elevation to enable access to the existing building at ground floor level.

August 17th, 2012|

Triple storey Woodlands School project update

Triple Storey Modular Buildings For Woodlands School Project
Layout drawing and picture of our 72 week triple storey building project at Woodlands School, the accommodation consists of: Ground floor security/ induction/ toilet block, open space canteen with full server.
Second floor open space sub-contractors offices, 3 bays of open-space, drying rooms, toilets and, showers and, kitchen server room.
Third floor heated/cool air con and carpet tiles, double glazed windows, motion sensor lighting etc.

August 17th, 2012|