The above is a triple stack project that was project managment accommodation for ISG interiors. Welfare facillities were on the ground floor, with the first and second floors housing offices and meeting rooms. It was sited in the main central London campus of the imperial college, to the rear of the nation history musuem. The project cost cerca 150k, it was installed and completed within three days. As the site was located in a quadrant of buildings, increased fire protection was needed, so the project included hardwood Georgian wire fixed pane windows and hardwood doors. Once installed a fire resistant mid-band was fitted between the floors.