BAM Construction, Modular Building in Glan Clwyd as Patient Record Storage

BAM Construction are carrying out extensive works at Clan Clwyd Hospital part of which is a total refurbishment of their patient record store. A medium term solution was required and BAM turned to Danzer to help them. Danzer provided a single storey record facility with some additional offices at first floor.

The ground the unit was being placed on, slopes dramatically so extensive foundation had to be installed to take the weight of the building ,with the documents in, and to ensure it remained flat to allow the rolling archive system to operate. The restricted space also lead to a complicated ramp and staircase to enable access.