One Day Wonders!
24 hr installation for Eric Wright Group by for AV team
A third village is also being developed as part of the scheme at The former Westcliffe Hospital, Turnhurst Road, Chell.
Together the developments will provide 390 extra care apartments over the next three years in the biggest scheme of its kind to ever be developed in Stoke-on-Trent.
Luckily the weather was on our side on the day of delivery for the new build units for Holdcroft Fields and the installation went pretty smoothly, but putting twelve 9.6m x 3m cabins in place in such a short space of time is no mean feat!
The 6 on 6 set up saw us utilize both our OpenSpace product alongside standard units, linked with external staircases. The commission featured up graded insulation levels, UPVC double glazing, PIR lighting controls, timer controlled heating and water saving push taps to wash basins.
We also refreshed existing stock to provide the same configuration at the second development site at Blurton. All units were finished to feature Eric Wright Group’s distinctive black and orange branding.