Our team are currently on site and installing a very large temporary accommodation solution for Manchester City and their new training facility. AVDanzer are proud to have been appointed by our client BAM Construction and anticipate that the 3 storey OpenSpace units will be ready to hand over before the end of October.

The main accommodation will provide 1,468m2 – comprising 51 OpenSpace units over 3 floors. There are enclosed staircases and emergency exits built into the scheme, along with lift access to a viewing gallery. The project is expected to last 92 weeks and once this main complex is fully installed we will add a 5 module visitor centre.

OpenSpace Etihad Manchester City BAM

These images show the anti-vandal units being installed as initial works get under way.

All the accommodation for this site is being built at our centrally located Nottingham factory, and installed by our in-house highly trained installation team lead by Andrew Little.