LinkPak Modular Buildings

Many years of expertise in delivering projects nationwide have enabled us to develop and define a suite of market leading products that are perfectly suited to the special requirements of temporary and permanent buildings.

Danzer Linkpak NG modular buildings are now the industry standard in modular accommodation. Years of expertise gained from delivering projects for schools, colleges and nurseries have enabled us to develop and refine a market leading product, perfectly suited to the special needs of pupils and teachers.

We can add further units, another storey or even move your building to another site. The rules for conventional building construction simply do not apply to the Linkpak NG, with low running and maintenance costs and short installation times, we continue to expand your possibilities.

Reducing lead times, increasing energy efficiency, optimising space and minimising environmental impact.

We continue to provide:
• Energy efficient heating and lighting systems to optimise the working environment and minimise running costs
• Integrated security and hazard control systems with remote monitoring
• Removable and reusable access and partitioning systems to provide flexibility in use
• Continual refinement to building specification and build quality to harness improvements in building materials technology

Environmental features that use sustainable resources
• Sun tubes harness and refract sunlight to illuminate the interior
• Natural rainwater harvesting reduces water consumption through toilet flushing
• Natural ventilation and heat insulation deliver the optimum working environment

Build
• Galvanised steel floor
• Erected to pad foundations
• Structural steel frame
• Optional powder coated aluminium window frames
• Tailored roof structure and finish
• Optional cladding system
• Variable modular building heights
• Disabled access fully DDA compliant

Security
• Window restrictors for safety and security
• Optional electrically controlled access doors

Heating and cooling
• CFC-Free insulation to walls and roof
• Remote controlled blinds to roof lights for shading
• Tinted glass reducing solar gain
• Pilkington K rated low emission double glazed units
• Factory fitted under floor heating
• Low level natural ventilation
• Trickle vents to windows for background ventilation

Lighting
• Room temperature controlled roof lights with rain sensors

Danzer was chosen to design, supply, install and commission this new single storey nursery unit for 26 children plus staff.

The tender also included associated services, ground works, additional car parking and external storage. In total the 7 modular units provide a spacious floor area of 211.20m2 incorporating activity rooms, baby change and sleep room facilities, kitchen, laundry, office, WC and staff room.

The building is finished off with external platisol steel cladding, whilst features such as double glazing, fire retardant boarding and powder coated aluminium windows ensure all current Building Regulations and DDA requirements are met.

Danzer worked closely with the school to ensure that delivery of the modules and other works did not interfere with the school’s day to day activities. The whole scheme was completed within 16 weeks, comfortably meeting the deadline and delivered within budget.

Building high quality, high specification modular buildings is what we do. Equipping them to meet the specific needs of our customers is what makes our buildings excellent. Tailored designs with a variety of internal and external finishes; one, two and three storey structures to optimise space; and a whole host of electronically controlled devices to improve the working environment. It all contributes to the enjoyment and functionality of a Linkpak NG commission.

And as the move towards carbon neutrality gathers more momentum, so we have added a range of environmentally friendly features to improve energy efficiency. With lower running costs, Linkpak NG becomes an even better choice when you’re looking for a practical building solution.

Rapid response, speedy construction, meticulous installation. All from one supplier, all from one point of contact. It means we can be more accommodating of your needs and more responsive to your brief. Our team will deliver your structure in perfect condition for use. Fit for purpose, whichever of the wide variety of uses you choose, and fit for long term occupancy. Call us today and outline your building needs. We’ll be delighted to assist you in explaining what a Linkpak NG modular structure can do for you.

Dog Kennel Primary School, East Dulwich

Dog Kennel Primary School in East Dulwich is now complete. We demolished and removed the old building, undertook extensive ground works, including ground reduction, built an 80 metre retaining wall, and created new drainage and duct work.

We have constructed large amphitheatre steps linking the existing nursery playground to the new facility. There is a large canopy spanning the front elevation of the new building and the adjacent building. It has been designed to highlight the aesthetic qualities of the finished classroom building with black render combined with thermowood cladding external finish.

Commenting on this project Danzer Ltd’s Dan Holloway said: “The Dog Kennel project had some challenges as access to the site was tricky and the school specified an unusual freestanding canopy which needed a creative solution. This, combined with the on-going design changes proved a challenge but we worked hard to resolve the difficulties and it’s great to see this lovely looking building ready to go.”

For more on this story click here

ASHWORTH SECURE HOSPITAL

Built for Merseycare NHS trust, this Linkpak building is a temporary solution whilst major refurbishment works were carried out at the hospital. There are 5 modules totalling size 8.7 x 15m. Incorporates a security reception, visitors search room with x-ray machine visitors waiting room, interview room, kitchen and toilet facilities. Extendable rain canopies, timber ramping and steps to main entrance, monopitch roof, Vulcan shiplap weatherboarding. Read more…

MAYFIELD PRIMARY SCHOOL

Working in conjunction with the project managers E C Harris, we supplied our trademark Linkpak modular building providing a double classroom with WC facilities (156m2). There are 6 modules totalling size 8.7 x 18m. Two classrooms, storage, toilets and entrance lobby. Finished with Steni exterior cladding, suspended ceiling, upvc windows with curved heads, timber ramps and steps. The school were involved in the project every step of the way choosing all the finishes including the interior colour scheme even down to the toilet cubicles! Read more…

 

AINTREE HOSPITAL

This new building would need to connect with an existing building at height to provide access to the second floor. However the floor levels did not meet requiring a “filler” level, in the new building, something other manufacturers were unable to provide. Danzer provided the building using its Steel OpenSpace product with 15no 9.6 x 3m modules over 2 floors and an intermediate filler level. The building also included an enclosed staircase and a canopy walkway across part of the front and the side elevation to enable access to the existing building at ground floor level. Read more…

 

RAYNHAM MUSIC SCHOOL

This design and build project was supplied to the London Borough of Enfield at short notice, a last minute addition to their already very busy Summer school build programme. Danzer worked on the design and offered Enfield the specialist advice needed for such a building. Large windows allowed in as much natural light as possible, by adapting our module structure to allow over-sized windows. A vertical cedar clad boarding which blended in well with the Nursery farm next door. The installation met the clients programme, and was handed over within 6 weeks of order. Read more…

 

CARLTON SCHOOL

We’ve just put the finishing touches to our second modular build for Nottingham County Council, this time for Carlton Central Junior School. We used our new process of cold-formed steel (CFS) frame construction on this project, a process that provides an extended structural guarantee giving our modular classrooms a 60-year structural guarantee. Read more…

 

COSTOCK PRIMARY

An overall building height which is 4m required us to transport the units on articulated low loaders. As access on site was also tight, they were then transferred on to a rigid vehicle which travelled across a trackway which was put in place to protect the school grass. They were then lifted into their final position and commissioned for use with all services being fully connected. Read more…

 

CLAYHALL PAVILLION

The Danzer team demolished the old pavilion building in mid-January and provided ground works and the construction of a raft foundation whilst the modular LinkPak NG buildings were manufactured off site. The new facility includes home and away changing rooms, showers and toilets as well as a new club house, storage space and a referees’ facility. During the winter months the pavilion building will be used by other sports teams in the area. Read more…

 

COCKFOSTERS, LONDON

Four 9.4m x 3m LinkPak modules double-stacked, to provide an open plan office space and toilet facilities on the ground floor connected by an internal staircase to an open plan training area above. Read more…

 

CHARLES DICKENS SCHOOL

The build was part of a £750,000 commission by the London Borough of Southwark to provide new facilities for three London schools. Charles Dickens needed a fast solution to the problem of over subscription at the school and a modular building enabled construction to take place off site while preparatory work commenced on the ground, speeding up the overall process from procurement to completion by many weeks. Read more…

 

EMMAUS

A 16 module building, which is configured over two floors, was manufactured delivered and installed in three phases to enable the Emmaus Charity to raise funds at each stage. The final phase has been installed and now all 23 rooms are available to be used. Read more…

 

HARLAN LABORATORIES

We manufactured and delivered the units from our Langley Mill factory in Nottingham in four phases – supplying 16 modules with each phase. Our installation team handled the fitting of doors, trims and fixings on site, including making sure the exterior Steni Brick cladding lined up perfectly – a challenging task on a build of this scale. Fittings such as autoclaves, incubators and extraction facilities were installed by specialist companies. Read more…

 

MABEY, BUCKINGHAMSHIRE

Our Linkpak NG modular product proved to be a great choice as it offers the ability to create open spaces at low costs and the whole building was built by us, here in the UK, delivered and installed for just £135,000. The project features five 12x3m Linkpak modules which together form the new building which provides 180 sq m of space. Linkpak’s flexibility has allowed us to design a low-cost, energy efficient building which provides an office space, meeting room, canteen and kitchen facilities, toilets and a drying room. Read more…

 

SHARDLOW

Featuring our LinkPak steel and timber modular product, no fewer than sixty four 33m x 48m modules make up this substantial building which will provide laboratory space for a food processing company. The building replaces one which had previously been fire damaged, was towards the end of its lifespan and was no longer fit for purpose. Read more…

 

MINSTER, THANET

The new units were constructed by our team at Langley Mill incorporating revisions to the structural specification as part of our continuing product development. They are finished in a London yellow brick and a grey/black slate tile to the site constructed pitch roof. The external finishes to the building complements other buildings at the school. Read more…

Like to know more?